Please enabled Javascript to create Quote.
What are the dimensions of the
shower pan floor?
Feet:
x
OR
Inches:
x
OR
Sq. Ft:
Cancel
Next Page
What is the job address or city or zip code?
Address
Unit Number
Cancel
Next Page
Previous Page
Please select
building type:
Detached Home
1 Story Detached Home
2 Story Detached Home
3 Story Detached Home
4 Story Detached Home
Condo / Apt / Commercial Building
1-2 Story Condo / Apt Building
3-4 Story Condo / Apt Building
5+ Story Condo / Apt Building
Cancel
Next Page
Previous Page
Does the shower have a seat framed in?
Yes
No
Is the seat a floating style
or grounded seat?
Floating
Grounded
How long is the seat?
Enter length in feet (decimals okay).
Cancel
Next Page
Previous Page
Length
Type
Are there any other seats
in this shower?
Yes
No
Cancel
Next Page
Previous Page
Does the shower have any of the
following items:
Round Corners
Tubledge
Cancel
Next Page
Previous Page
Are there any miscellaneous optional items you want hot mopped?
Will change the price upon review by office staff.
Miscellaneous Notes
Cancel
Next Page
Previous Page
Are there any more showers on this order that are exactly the same as this shower?
Yes
No
How many are there of the same shower?
Quantity
Cancel
Next Page
Previous Page
Qty
Dimensions
Additions
Misc
Address:
Building Type:
Are there any more showers on this order?
Yes
No
Cancel
Next Page
Previous Page
Please enter the following info:
Name
(required)
Email
For sending estimates and invoices (email or phone required).
Phone
For texting sample photos and job details (email or phone required).
Company
(optional)
License
(optional)
Cancel
Next Page
Previous Page
Calculating Price...
The wood blocking and new drain must be in before hot mop. More details to follow.
Do you want to get this scheduled?
No
Yes
However, wood blocking and new drain must be in before hot mop:
10 inches of wood-blocking around the base of shower walls
Dam/curb at least 3.5" or higher
Bench and/or tub ledge solid all around with min. 4" blocking above and around on walls
NEW
drain (bolt-together type) - top and bottom drain pieces must be new
Drain bottom flange flush or resting against sub-floor
If water testing, make sure there is a
TEST PLUG
in the drain pipe before hot mop
Cancel
Next Page
Previous Page
What day will it be ready for hot mop?
Must be available between 7am-3pm
Cancel
Next Page
Previous Page
Submitting Quote...
The information has been submitted and you will be contacted soon to finalize your order.
You will be redirected to https://www.westcoastshowerpans.com/ soon.
Thank you for your interest.
Feel free to call us at
(888) 696-1972
for more details.
You will be redirected to https://www.westcoastshowerpans.com/ soon.
(888) 696-1972